Subject: Award
Contract for Construction Phase Services for Dana Point Library
ceo CONCUR |
County Counsel Review |
Clerk of the
Board |
||||||||
Concur |
N/A |
Discussion |
||||||||
|
|
3 Votes Board Majority |
||||||||
|
|
|
||||||||
Budgeted: Yes |
Current
Year Cost: $5,994,290 |
Annual
Cost: N/A |
||||||||
|
|
|
||||||||
Staffing
Impact:
|
No |
#
of Positions: |
Sole
Source: No |
|||||||
Current Fiscal Year Revenue: N/A
|
||||||||||
Prior Board Action: 9/26/2023 #24 |
||||||||||
RECOMMENDED
ACTION(S):
1. |
Find that the Dana Point Library Project
is categorically exempt from the provisions of CEQA, Class 1 (Existing
Facilities) and Class 2 (Replacement or Reconstruction) pursuant to CEQA
Guidelines, Sections 15301 and 15302. |
2. |
Award contract to C.W. Driver, LLC to
provide Construction Phase Services for the Dana Point Library Project, in an
amount not to exceed $5,994,290, effective upon execution of all necessary
signatures, to be completed within 365 days of the effective date of the
Notice to Proceed. |
3. |
Authorize the
Director of OC Public Works or designee to execute the Construction Phase
Services Contract with C.W. Driver, LLC. |
SUMMARY:
Award of the
contract for Construction Phase Services for the Dana Point Library Project
will provide for updates to the current library and parking lot to comply with
Americans with Disabilities Act standards and provide for a contemporary
library for the public to use for many years to come.
BACKGROUND
INFORMATION:
The Dana Point
Library (Library) is located at 33841 Niguel Road in the City of Dana Point and
was built in 1976. The Library Project (Project) Scope of Work proposes to
demolish the existing parking lot, monument sign and other miscellaneous site
items, including existing landscape; regrade site and construct parking lot,
hardscape, landscape, site lighting and monument sign; demolish and construct
restrooms to meet current Americans with Disabilities Act standards; demolish
and replace mechanical system including controls; demolish and install new
energy efficient interior and exterior façade light fixtures to meet Title 24
requirements; demolish and replace interior finishes, doors, hardware,
millwork, ceiling and flooring; demolish and replace building fire alarm and
security systems; modify fire sprinklers as required to accommodate new
improvements; demolish and install exterior and interior miscellaneous
wayfinding signage as required; and remove and install book shelving to present
a more compliant, modern and attractive Library for local residents to enjoy.
On April 12, 2023,
OC Public Works issued a Request for Proposal (RFP) for Construction Manager
At-Risk Pre-Construction Phase Services for the Project and C.W. Driver, LLC
(Contractor) was selected.
On September 26,
2023, the Board of Supervisors (Board) authorized the expenditure of funds in
an amount not to exceed $4,144,351 to fund a negotiated Construction Phase
Services (Services) Contract MA-012-24010114 (Contract) with the Contractor for
the Project and delegated authority to the Director of OC Public Works or
designee to execute the negotiated Services Contract with the condition that
the total sum does not exceed $4,144,351.
During the
Pre-Construction Phase of the Project, additional scope was identified to
account for unforeseen and necessary upgrades to heating, ventilation and air
conditioning, electrical, parking lot and landscaping. The Contract also needed
to account for materials cost escalation. This scope and escalation requires an
increase to the previously authorized Contract in the amount of $1,849,939. As
a result, the Director of OC Public Works or designee has not exercised the
delegated authority from the Board to expend funds or execute the Contract with
the Contractor as the revised Project cost exceeds the amount previously
authorized by the Board.
OC Public Works is
procuring Services for this Project in accordance with the 2020 Design and
Construction Procurement Policy Manual (DCPM), Section 5.6. The Orange County
Preference Policy is not applicable to contracts procured in accordance with
the DCPM.
OC Public Works is
recommending the Board award the Contract for Services to the Contractor in the
amount of $5,994,290.
The Contract does
not include subcontractors or pass through to other provides. See Attachment B
for Contract Summary Form.
Compliance with CEQA: The proposed
project is categorically exempt from CEQA, Class 1, (Existing Facilities) and
Class 2 (Replacement or Reconstruction), pursuant to CEQA Guidelines Sections
15301 and 15302 because it consists of repair and maintenance of existing
public facilities involving negligible expansion of the existing use and
replacement or reconstruction of existing structures and facilities on the same
site as the structures being replaced and will have the same purpose and
capacity as the structures being replaced.
FINANCIAL IMPACT:
Appropriations for
the Contract are included in Fund 119, OC Community Resources/OC Public
Libraries, FY 2023-24 Budget.
The proposed Contract include a provision
stating that the Contract may be terminated upon 10 days written notice for
cause and upon not less than seven calendar days' written notice for
convenience without penalty to the County.
STAFFING IMPACT:
N/A
REVIEWING
AGENCIES:
OC Community Resources
ATTACHMENT(S):
Attachment A - Contract
MA-012-24010114 with C.W. Driver, LLC
Attachment B - Contract Summary Form
Attachment C - Corporate Resolution for C.W. Driver, LLC